Talent Oregon Wagner Street Project


Wow, lots of work on the old house this past 10 days without a lot to show for it but I think the “turning point” is near where things will start to feel more like the big progress I was hoping for.

The little back porch is completed with some 3/4″ cedar boards that are really pretty and I got at a great discount of .50 per foot. This wood is somewhat thin for a porch though ~3/4 fir was the most common porch board historically around here so it looks correct.

I’ll seal it with special stain today (Red Cedar transparent deck stain) and it should look super nice that way, though I may eventually have to paint this to be consistent with the house exterior paint job. Historically the (clear and gorgeous) woods used in construction were stained dark or painted.

A bottleneck has been the proper removal / disposal of the asbestos sheet flooring that was in kitchen and popcorn ceiling in living room (which may contain asbestos). You can pay a small fortune to have this work done or do it yourself as owner, so I’m doing it. Like so many environmental “evils”, the story of asbestos is really interesting and confusing. The more I know about the many issues (which is quite a bit now), the less I seem to understand. Here’s a neat asbestos identification guide from NY.

Asbestos went from wonder material used in millions of houses and thousands of schools and buildings to despised cancer-causing nightmare material requiring very special disposal procedures. There is a substantial bureaucracy in place via the DEQ to give advice about removal procedures but they won’t help identify the materials. For that you need lab analysis at $20 per sample. I’m treating the ceiling popcorn stuff as contaminated but should have had it sampled because it’s messy and if it’s *not* asbestos I could do this work faster, but it’s almost done now. The ceiling stuff scraped off smoothly after wetting using a sheetrock taping blade. I covered the floor with the 6 mil plastic required for disposal (2 layers of 6 mil plastic, both layers sealed with duct tape for most of the disposal wrapping though I can also use a cardboard box, sealed with duct tape and then wrapped with 6 mil).

Hey, maybe I AM making good progress!

Wagner Street Project – electrical panel Inspection is today


OK, today is my electrical panel inspection. Although I’d had it tagged before but it needed a new one because it had been disconnected so long.  This meant I had to make changes for what I think is a change in the code.  The main wires were looped down via a J shape onto the main bus but now need to be going straight on from the top.  I also had to bond to the water pipe via a special clamp that takes a bare #4 copper wire going up to a neutral in the panel (this was not a change in rules).

Hopefully I’ll get the tag today and Pacific Power will hook me up tomorrow as scheduled, and put in the new meter (the Power Company does the connect from street to the wires as they come out of the mast on top of roof).

panelfire.jpg

House Painting


We are almost done painting our house and most of the neighbor report it’s looking good to them.

We’ve gotten fancier than last time with 4 colors, the last two just for highlights. I’d started this because I thought we might be selling the place to buy the Nut Ranch – a cool old historic place just out of town, but I’m no longer enamored with that house.